Annual Street Maintenance Project 27-BB: Collector and Residential Street Resurfacing

(Updated October 7, 2026)

The FY27 Annual Street Maintenance - Collector and Residential Street Resurfacing, Project 27-BB will resurface various streets throughout the City of Campbell; proposed street list. The goal of this project was to extend the useful life of the pavement and bring the street segments up to a level of service expected by the residents of Campbell.

The Project:

  • Will install new ADA compliant accessibility ramps where possible.
  • Resurface approximately 2.01 centerline miles of collector/residential streets.
  • Replace existing striping and adjust existing utilities to newly finished grade. 

The City of Campbell used the following funding sources to help pay for this project: Vehicle Registration Fees, Vehicle Impact Fees, Gas Tax, Measure B, Campbell's Capital Reserves and Senate Bill 1 (SB1), the Road Repair and Accountability Act of 2017. 


2016MeasureB_Logo VRF logoBuilding CA Logo of The City of Campbell

  1. PROGRESS
  2. SCHEDULE

The City of Campbell is responsible for maintaining approximately 94 miles of roadway. To help track the pavement condition of these streets, the City utilizes the Metropolitan Transportation Commission’s (MTC) StreetSaver Pavement Management Program.

Pavement management principles advocate that it is better from a “life-cycle” cost analysis to spend money on preventative maintenance measures when a street is in good or fair condition as opposed to corrective maintenance – waiting until the street deteriorates to poor condition where a more substantial form of rehabilitation, such as an overlay or reconstruction would be warranted.